View Post

Waste categorization reclassification – Facility Remediation

A previous owner of the client’s facility had placed a large pile of a process by-product or waste on the property approximately 40 years ago, containing a small amount of material equivalent to Agricultural Lime. Over the period between the 1970s and 2005 different owners of the facility either ignored the presence of the material or promised to clean up …

View Post

Gap analysis and corrective actions – Laboratory testing facility Start-up

SWSI personnel were contracted to help with the startup of a new laboratory in South Eastern US. The facility would include a formulation laboratory to prepare small quantities of materials for testing as possible consumer products and an analytical laboratory to determine the composition of the samples shipped for testing. The laboratory was under construction at the time of contract …